Translate:
EN
Translate:
Solved customer's issue of the step bumper not allowing dock access.
Relocate 13 ton Hiab crane from the front to the rear of the frame.
A full length of one of the boom arms did not have a support structure to nest in while the vehicle was in motion, causing it to move and bounce.
This customer's trailer was the victim of a hit and run. We repaired the damage to like-new condition.
Save money by repairing your equipment instead of replacing it.
HD inspection tables requisitioned by a large oil field equipment supplier and service company.
On-site gate installation on a local airport taxiway.
Fabrication and on-site installation of a new gate across the taxiway.
Your imagination is the only limit.
Another one-off custom piece. This table allows banding straps to be firmly held in place, while a mechanical dot matrix printer etches information onto the bands.
Copyright © 2023 Southwestern Steel Fabrication - All Rights Reserved.
Powered by GoDaddy